Task board
Showing 34 matching tasks · Clear filters
- Make a warning sign for the UV printing areaElectronics 30 min

- get medikat and ventoy drive for the fab lab General 1 hr 30 min
- Sweep / Dust the Metal ShopGeneral 1 hr

- Organize the the large scrap wood bin in the wood shopWoodshop 30 min

- laser settings bookLaser Cutting 1 hr 30 min
- barn door and gallery door both have same sign "main entranfe"General 1 hr
- 8 PCs to evaluate for eeastrGeneral 2 hr
- Chico Library General 1 min

- Downtown Advertising General 3 min
- Student AdvertisingGeneral 3 min
- Air compressor to red laserLaser Cutting 1 hr
- pressure wash the lasercutter honeycomb beds with pressure washerLaser Cutting 2 hr
- Add a backboard to the workbench level of the pallet rackWoodshop 1 hr
- Remove random items and debris from under the CNCWoodshop 30 min
- Dispose of large broken tools on floorWoodshop 30 min
- Remount bulletin boardsGeneral 30 min
- Power tool shelf extension Woodshop 45 min
- Organize power toolsGeneral 1 hr
- Organize tool on pegboard and on racksWoodshop 45 min
- Throw away tools that are broken or unfixableGeneral 2 hr
- Sweep woodshop floor and vacuum around tool areasWoodshop 45 min
- Build some shelves and tables etc for the main Fab Lab workspaceGeneral 2 hr
- Analyze graphics cards prepare for install.General 2 hr
- Set up recurring tasks General 30 min
- Volunteer task board - minimum minutesAdmin 15 min
- Empty the sawdust out of the dust collectorsGeneral 1 hr
- Coordinate Wednesday night presentation General 2 hr
- Social Media Posting (weekly) ///General 2 hr
